Ag fleet maintenance: what to track so the aircraft is not grounded at the peak of the season

In agricultural aviation, the calendar does not belong to the operator. The application window belongs to the crop, and it does not wait for a propeller to come back from overhaul. That is why an aircraft grounded in the middle of the season costs more than the maintenance itself: it costs the job that was not done and the customer who called another company.

That downtime was almost always predictable. The due date was there, in hours, in cycles or on the calendar. What was missing was seeing it months earlier, when the day could still be chosen. This article describes the four controls that make that difference in any ag fleet, with piston or turbine airplane, helicopter or drone.

1. Due dates on three clocks

Every tracked item on an aircraft comes due on one of three clocks, or on more than one at the same time:

  • Flight hours: scheduled inspections, engine and propeller overhaul.
  • Cycles: starts and landings, which weigh more on those who make dozens of short takeoffs in a single day.
  • Calendar: items that expire while parked, such as the fire extinguisher, hoses and annual inspections.

Ag operations punish all three. The aircraft flies a lot in a few months, accumulates cycles like no other segment and then sits in the hangar during the off-season, while the calendar clock keeps running.

The control that works has one line per item, with the three limits and whichever comes first. A spreadsheet does that for one aircraft. For a fleet, what breaks is the update: someone has to copy the hours of every flight, of every airplane, every day.

2. Directives per aircraft, not per model

An Airworthiness Directive applies to a specific product: a model, a range of serial numbers, an engine, a propeller. Two aircraft of the same model can have different lists, because one had its propeller replaced and the other did not.

The control has to answer three questions, by registration: which directives apply, what the method of compliance was for each one and, for recurring ones, when the next action is due. Without the third answer, the recurring directive becomes the mid-season surprise.

3. The part before the downtime

In season, the part you are missing is the one everybody is looking for. The shop that serves ag operators knows this and buys ahead. The operator with its own shop needs the same habit: look at the due dates of the coming months and check in inventory what each one will consume.

That depends on two simple things that are rarely together: inventory recorded with part number and quantity, and the work order issuing what was installed. When parts are not issued, inventory lies, and the purchase is made in a rush.

4. Downtime you choose, not downtime you suffer

A due date in hours has no date. "60 hours remaining" can be three weeks away in season or six months away in the off-season. What makes planning possible is converting the hours remaining into a date, at the pace that aircraft actually flies.

With the date in hand, the decision changes. Items that would come due in March, April and May can be brought forward and done together in February, in a single downtime, before the season starts. Bringing work forward costs a few hours of component life. Stopping at the peak costs the season.

How this looks in Alis

In Alis, the flight entered updates the aircraft's due dates, by hours, cycles and calendar, with no one copying numbers. Directives and inspections are kept by registration, the downtime forecast projects each due date onto the calendar at the pace of the last 90 days, and the maintenance work order lives in the same system as inventory. It works for any aircraft in the fleet, of any make.

Want to see your fleet's due dates projected onto the calendar? Talk to Alis.


This article is for information only and does not replace the approved maintenance program, the manufacturer's manuals or the regulations that apply to your operation.